RENOWELL · ENGINEERING
Engineering tools
Estimate a pump operating point or prepare a replacement inquiry. Your entries stay in this tab.
RENOWELL · A
Hydraulic workbench
Estimate flow, power and steady shaft load, then compare two operating points.
Efficiency varies with operating conditions; leave it blank if unknown. Assumptions are not test results. Enter the required flow at the pump outlet, with circuit losses included only where assessed by the equipment engineer.
Scenario A
More information needed
Enter the required inputs to calculate a scenario.
Missing / unconfirmed: Displacement · Actual pump-shaft speed
Use these estimates for initial discussion. Confirm model ratings, inlet conditions, fluid compatibility, starting loads and motor thermal limits with Renowell and the equipment engineer before selection or installation.
Use pump outlet pressure minus inlet pressure, at the same operating point. Load pressure elsewhere in the circuit is not necessarily this difference.
Sources & method
Source content checked 2 October 2026 · recheck due 2 April 2027
These references explain the formulas. Their product ratings do not apply to Renowell pumps.
Q₀ = Dn/1000 · Q = Q₀ηv · Ph = ΔpQ/600 · Ps = Ph/(ηvηm) · T = ΔpD/(20πηm). D in cm³/rev, n in rpm, Δp in bar, Q in L/min.
Calculation scope: displacement ≤ 10,000 cm³/rev, flow ≤ 30,000 L/min, shaft speed ≤ 30,000 rpm and pressure difference ≤ 1,000 bar. These are software scope limits, not permissible pump operating limits. No universal design margin is applied.
- Parker hydraulic pump formulas · p. 2 ↗PARKER-FORMULAS · MSG30-5524-M1/UK · March 2023
- Danfoss sizing equations · p. 49 ↗DANFOSS-FORMULAS · BC518934461820en-000102 · July 2026
Includes your inputs, assumptions, missing details and formula references. After editing, copy or print the updated brief.
Calculation / inquiry brief
Review and submit on the next page. Stay in this tab: refreshing clears the brief and selected files.
RENOWELL · B
Replacement brief
Gather the model, connections and operating conditions for a replacement inquiry.
Before ordering, confirm the full model, drawings, operating limits and availability with Renowell. A completed checklist does not confirm interchangeability.
Enter the recorded value, drawing reference, or leave blank if unknown.
More information needed
Continue to inquiry and ask for help with the missing details.
Missing / unconfirmed
- Original manufacturer
- Complete model code
- Rotation designation
- Viewing direction for rotation
- Shaft profile & dimensions
- Mounting flange / pilot / bolt pattern
- Port sizes, standards & orientation
- Fluid product / grade
- Actual pump-shaft speed
- Operating pressure, peaks & duration
- Quantity required
- Pump arrangement
Before ordering, confirm the full model, drawings, operating limits and availability with Renowell. A completed checklist does not confirm interchangeability.
Sources & method
Source content checked 2 October 2026 · recheck due 2 April 2027
- Renowell replacement identification guide ↗RENOWELL-CHECKLIST · Editorial checklist · 21 September 2026
Includes your inputs, assumptions, missing details and formula references. After editing, copy or print the updated brief.
Calculation / inquiry brief
Review and submit on the next page. Stay in this tab: refreshing clears the brief and selected files.
Entries stay in this tab. Reloading or leaving clears them.
